Menu
Hi there. I have a property letting website where I need to upload several images.
If I want to change the order of my images I need to delete the image, then delete the other image (where I’m going to put the first one) then re upload the images in the new order.
Example
Image one
Image two
Image three
To put image 3 on the top I need to delete image 3, delete image 1, upload image 3 (to the top) and image 1 (at the bottom) its annoying when i’v got loads to re arrange.
Is there a Script where I can just drag them in the order I want (like top bebo friends).
Thanks
Peter